[ad_1]
A key stage in the construction of P&O Cruises’ next ship has been marked by Meyer Werft. The team building the 184,000-tonne Arvia celebrated the keel laying with a traditional coin-laying.
[ad_2]
[ad_1]
A key stage in the construction of P&O Cruises’ next ship has been marked by Meyer Werft. The team building the 184,000-tonne Arvia celebrated the keel laying with a traditional coin-laying.
[ad_2]